bridge over A 7 Bridge over A 7, Germany. Reanalysis project; strongly skewed six-lane road bridge with a span of 66.0 m and a width of 34.0 m; built at Hamburg in 1970 transferring Kieler Street over motorway A7; orthotropic steel deck supported by two steel box girders. Checking engineering and structural analysis based on a refined shell element model (2016-2017).
Koehlbrand_Bridge Köhlbrand Bridge, Germany. Reanalysis and retrofit project; cable-stayed bridge built at Hamburg in 1974; two steel A-pylons; 88 full locked cables in fan arrangement; steel box girder with orthotropic deck; deep foundations on bored piles; spans of 97.5 – 325 – 97.5 m; height 135 m; width 17 m; residual lifetime analysis and retrofit design. Checking engineering (2015-2018).
Hachmann Bridge Hachmann Bridge, Germany. Reanalysis project; skew steel truss road and railway bridge with a span of 64.0 m and a width of 13.4 m; built at Hamburg in 1940; residual lifetime analysis and traffic load classification. Checking engineering (2015-2016).
Howaldt_Bridge Howaldt Bridge, Germany. Reanalysis and retrofit project; skew steel truss road bridge with a span of 64.0 m and a width of 13.4 m; built at Hamburg in 1940; residual lifetime analysis; re-placement of concrete deck and deck-supporting longitudinal steel girders; elaborate scaffolding and housing suspended from bridge. Checking engineering and site inspection (2014-2017).
shanghai bridge Shanghai Bridge, Germany. Road bridge at Hamburg with a length of 40.8 m and an overall width of 21.2 m; orthotropic steel deck supported by variable-height steel girders; pedestrian and bicycle paths on 5.1-m cantilever girders; frame system with inclined column fixed to one abutment; welding of all shop and site joints; pile foundations. Checking engineering.
Billbrook Canal Bridge Billbrook Canal Bridge, Germany. Road bridge at Hamburg with one span of 50.55 m and an overall width of 18.15 m; orthotropic steel deck suspended from self-anchored tubular steel arch; arch tubes unbraced; hangers radially inclined; welding of all shop and site joints except hanger connections (bolted). Checking engineering.
shin chon bridge Shin Chon Bridge, Korea. Two prestressed concrete viaducts of 1050 m length, 5 main spans of 170 m each, monocellular concrete boxes built by free cantilever method, twin piers of up to 90 m height, all piers monolithically connected to superstructure. Preliminary design, analysis and detailed structural design for execution (while working for VSL Korea, Seoul).
Portsmouth Millennium Tower (Spinnaker Tower), United Kingdom. 150-m high landmark tower at national gateway location, intended to hail the beginning of the new millennium and to demonstrate state-of-the-art design and technology. Preliminary design, co-ordination of an international team of architects and engineers.
Bang_Na_Expressway Bang Na - Bang Pli - Bang Pakong Expressway, Thailand. Viaducts for 54 km of elevated highway including 28 ramps with 28 elevated toll plazas, 14 platforms for surveillance buildings, and one interchange; superstructure and portal frames designed as precast segmental concrete box girders with external post-tensioning. Analysis and detailed structural design for execution (while working for J. Muller International, San Diego).
Confederation Bridge Confederation Bridge (Northumberland Strait Crossing Project), Canada. Highway bridge between Prince Edward Island and New Brunswick; main bridge consists of 43 continuous box girder spans of 250 m each; precasting of large post-tensioned concrete elements onshore; severe environmental and progressive collapse loads. Analysis and detailed structural design for execution (while working for J. Muller International, San Diego).
Carapeba-2 Carapeba-2, Brazil. Offshore gravity platform for 100 m water depth; oil production platform and 5000 t steel jacket. Analysis and executive structural design for transport and launching of jacket; design of structural strengthening of barge used for transport and launching.
Railway Bridge Duesseldorf Railway Bridge Düsseldorf-Neuss, Germany. Bridge for four railway tracks over Rhine River with main span of 250 m and side span of 135 m; continuous steel truss; main span stiffened by steel arch; orthotropic steel deck; erection of truss by incremental launching; welding of all structural shop and site joints. Analysis and detailed structural design for execution (while working for Krupp Industrietechnik, Duisburg).
  Triebischbach Bridge, Germany. New highway bridge in the State of Sachsen crossing the Triebischbach Valley, two three-lane viaducts of 430 m length each, spans up to 84 m, mono-cellular steel boxes launched incrementally with cast-in-place post-tensioned concrete deck. Alternative designs for bidding.
  Bridge Infrastructure Renewal Program, Washington, D.C. Research and development program funded by the Advanced Research Projects Agency (ARPA); transfer of defense technology to bridge engineering applications; use of fiber-reinforced plastics (composites). Feasibility study and conceptual structural design (while working for J. Muller International, San Diego).
  Carquinez Strait Bridge, California. Cable-stayed highway bridge with two main spans of 350 m and two side spans of 150 m; precast concrete deck in composite action with spatial steel pipe truss girder. Preliminary structural design including flutter analysis and design of steel truss nodes and connections (while working for J. Muller International, San Diego).
  Rio Santa Lucia Bridge, Uruguay. Highway bridge over Santa Lucia River near Montevideo with spans of 75 m - 155 m - 155 m - 75 m; continuous post-tensioned concrete box girder to be erected in cast-in-place balanced cantilever construction. Tender design; first place in international design competition and bidding (while working for Noronha Engenharia, Rio de Janeiro).
  Bridge over Enz River, Germany. Suspension bridge for pedestrians on the site of the State Garden Exhibition at Pforzheim. Design of a tuned-mass damper.
  Pneumatic Structures, Germany. Use of pneumatic structures for containment and shielding of security-relevant facilities. Preliminary study regarding impact loading.

Santos Bridge, Brazil. Highway bridge between Santos Island and continent including two cable-stayed bridges with main spans of 600 m. Feasibility study and preliminary structural design (while working for Noronha Engenharia, Rio de Janeiro).
  Atum-3, Brazil. Offshore gravity platform; steel jacket and 2000 t platform deck. Analysis and executive structural design for transport of deck; design of structural strengthening of barge used for transport.
  Rama IX, Thailand. Cable-stayed bridge in Bangkok. Alternative designs for bidding (while working for Krupp Industrietechnik, Duisburg).
  Großhesselohe Bridge, Germany. Railway bridge at Großhesselohe near München; steel truss in composite action with concrete deck. Alternative design for bidding (while working for Krupp Industrietechnik, Duisburg).
  Grünental Bridge, Germany. Combined highway and railway bridge over the Kiel Canal; continuous steel truss with orthotropic steel deck. Alternative designs for bidding (while working for Krupp Industrietechnik, Duisburg).